View SURFACE Stats



Welcome Contact Us
  You are not logged in Log in
You are here: Deliverables

Send to Print

Deliverables

Following is a list of the deliverables of the SURFACE project. The files are in PDF format. Access to the confidential files is only available for the partners after login in.

No.

Title

WP

Level

Delivery date

File

D1

Project Quality Plan

WP1

C

January 06

D9.1

Interaction plans with other related projects

WP1

P

April 06

D2.1

System Requirements on QoS. Definitions and specifications

WP2

P

September 06

D3

Design of the single-user Optimal Transmit and Receive

WP3

P

September 06

D4.1

Preliminary design of the multi-user Optimal Transmit and Receive Strategy

WP4

C

December 06

D7.1

Definition of the link-to-system level interface

WP7

C

December 06

D4.2

Design of the multi-user Optimal Transmit and Receive Strategy

WP4

P

June 07

D7.2

Design specification of the air interface emulator

WP7

C

March 07

D5

Description of the Network Optimal Transmit and Receive

WP5

P

December 07

D7.3

First results from link and system level simulations

WP7

C

December 07

D8.1

Hardware and Software optimised design for the selected algorithms

WP8

P

December 07

D2.2

System Requirements. Channel Model Prediction

WP2

C

January 08

D6

Transmit and Receive Architecture Development and Algorithmic Implementation

WP6

P

March 08

D7.4

Performance Evaluation of Self Configurable Air Interface

WP7

P

December 08

D7.5

Air Interface Emulator Development

WP7

P

December 08

D7.6

Performance evaluation of TCP/IP based applications over the Self Configurable Air Interface

WP7

P

December 08

D8.2

Hardware complexity evaluation results

WP8

P

December 08

D8.3

Feasibility and deployment analysis of the SURFACE concept

WP8

P

December 08

D9.2

Report on Standard Contributions and Dissemination Activities

WP9

P

December 08

C=Confidential, P=Public